ELECTRIC SYSTEM |
MAIN COMPONENT |
Motor |
36V/250W brushless |
Frame |
Alloy aluminum |
(500W/750W/1000W optional) |
Fork |
Aluminum suspension lockout fork |
Battery |
36V 10.4Ah Li-ion battery (12.5/13/14.5/15/16Ah optional) |
Derailleur |
Shimano 7 speed |
with electric protection circuit, removable |
Cassette |
Shimao 7speed |
Charger |
100~240V, 50-60Hz, Smart fast charger |
Hub |
Quick release hub |
42V-1.5A |
Brake(F/R) |
Mechanical disc-brake (Hydraulic brake optional) |
Charge Time |
4-6 hours |
Brake Lever |
Alloy, power cut when braking |
Display |
LCD Middle Display |
Tire |
20"*4.0 pneumatic tire black Chaoyang |
Horn |
Available |
Rim |
Alloy or spoke wheel both available |
Operation |
Pedal assisted system (option torque sensor) |
Spokes |
Rear:13g; Front: 14g stainless |
PAS |
Pedal assisted system & throttle Grip |
Grip |
L: Comfort grip with ergonomic shape
R: Twist throttle(thumb shifer optional) |
Controller |
1:1 intelligent pedal assistant system |
Handle Bar |
Alloy aluminum |
Low noise & durable |
Handle Post |
Adjustable folding handle post XieJin |
Light(F) |
LED, high lumens |
Saddle |
Soft comfortable |
Light(R) |
LED, high lumens |
Seatpost |
Alloy adjustable aluminum XieJin |
Integrated Cable |
Available, convenient to replace parts |
Chainwheel |
52T,with alloy crank, Prowheel |
|
|
Chain |
Rust-resistant chain KMC |
PERFORMANCE |
Pedal |
Plastic with reflector, foldable (Aluminum pedal optional) |
Climbing ability |
15° |
Kickstand |
Big, Alloy aluminum |
Max Speed |
25-40km/h based on customers' requirement |
Fender (F & R) |
Painted steel |
Range |
45-50km by PAS, 35-40km by only electric |
Rear Rack |
Alloy aluminum |
Max Load |
120Kg |
Color |
Customizable |
PACKING & DELIVERY |
OTHERS |
N.W/G.W/set |
31.6kg /35kg |
MOQ |
200pcs |
Unfolding/Folding Size/set |
1740*620*1230(mm)/1170*470*750(mm) |
Carton Size/set |
1450*280*735(mm) |
OEM/ODM |
Customized logo, color, specs, CTN are acceptable |
Container Qty |
93sets/20GP, 180sets/40GP, 226sets/40HQ |
|
|
Delivery Time |
Sample: 7-15 days, mass production: 30-45 days |
|
|